An ADR is a short, dated record of one decision, kept beside the code; a changed decision gets a new record, not an edit.

Predict first

Before you read: predict

A payments ledger's repository holds six decision records about how amounts are rounded. Their status lines:

0003-round-each-line.md       Status: Superseded by ADR-0011
0011-round-each-invoice.md    Status: Superseded by ADR-0017
0013-round-fx-down.md         Status: Superseded by ADR-0019
0017-round-half-to-even.md    Status: Accepted
0019-round-fx-half-up.md      Status: Accepted
0021-round-at-settlement.md   Status: Proposed

ledger/round.ts carries the comment // rounding rule: see ADR-0003. A developer about to change the rule in that file must follow the decision in force for it.

Which record holds it?

Pick one

The 30-second version

Write each significant decision as a short numbered file in the repository: its context, the options weighed, the decision and its consequences. It is proposed until agreed, then accepted. To reverse it, write a new record and mark the old one superseded, pointing to its replacement. The decision in force is at the chain's end, if accepted.

An ADR is a short, dated record of one decision, kept beside the code; a changed decision gets a new record, not an edit.

How it works

Step 1 of 12

One decision. Each record describes the forces at play and a single decision in response to them, with its status and consequences. [S1, S2]

Analogy: A small brewery's brew book

A brewery keeps a brew book on the shelf beside the fermenters. Each numbered page records one dated decision about one beer: what was pressing (the usual maltster's price doubled; the cellar runs warm in August), what the brewers chose, and what it will cost them (a darker colour, a week longer in the tank). When they change their mind they never scratch a page out: they write the next numbered page and add “replaced by page 31” in the old page's margin. A new brewer who wants today's recipe opens any page about that beer and follows the margin notes to the last page. A page headed “trial, not agreed” changes nothing until the head brewer signs it.

In the brewhouse In the repository
One page, one dated recipe decision One ADR, one decision
What was pressing, what was chosen, what it costs Context, decision, consequences
The book on the shelf beside the fermenters ADRs in the repository beside the code
A new page, never a scratched-out one A new record, never an edit
“Replaced by page 31” in the margin “Superseded by ADR-0031” on the status line
Following margin notes to the last page Following the chain to the record in force
“Trial, not agreed” Proposed

Breaks down when: a brewer can taste the beer to check a page, while nothing in the code shows why it is built as it is. Wrong inference: “the code will tell a newcomer why.” A brew book is also read by one small crew, while a decision log is read by people who join years later.

In real terms: before you merge a decision, add its numbered file under docs/adr/, and when it replaces an older record, change that record's status line to point at the new one.

Try it

Answer first, then check. Nothing is saved.

Question 1 of 5

The ledger team has decided that every posting request must carry an idempotency key, after weighing a unique index on the posting's fields. The code is in pull request #882. Finance staff, who never use git, sometimes ask why the ledger works as it does.

Where should the decision record go?

Pick one

Question 2 of 5

The ledger team is drafting ADR-0015, “Refunds as reversal entries”, to replace ADR-0009 of 2025.

Which sentence belongs in ADR-0015's Context section?

Pick one

Question 3 of 5

The ledger team has written ADR-0021, “Round at settlement”, and its pull request adds the file to docs/adr/. Finance signs off every rounding change at its monthly review, next held on 14 October. The pull request merges this week.

Which status line should ADR-0021 carry when it merges?

Pick one

Question 4 of 5

In 2025 the ledger team recorded 0007-settle-payouts-daily.md, accepted, with the Decision “We will settle card payouts once a day, at 02:00.” Today the team agrees to settle payouts every hour. Its merge request adds 0015-settle-payouts-hourly.md, accepted, whose first line is Supersedes ADR-0007, and deletes ADR-0007's file.

Which change should the reviewer ask for before the merge?

Pick one

Question 5 of 5

A ledger's decision log after this week's merge:

0004-amounts-in-minor-units.md       Status: Accepted · Decides: amount type
0006-postgres-and-nightly-batch.md   Status: Superseded by ADR-0013 · Decides: posting store; settlement
0013-stream-settlement.md            Status: Accepted · Supersedes ADR-0006 · Decides: settlement

Amounts are still kept in minor units, as ADR-0004 chose; postings are still stored in Postgres, as ADR-0006 chose in 2025; settlement now runs on a stream. A new engineer asks the log which record holds for each question a record decides.

What does the log get wrong?

Pick one

Go deeper

Pro tip

Write the record when the decision is made, in about ten minutes, with the options you turned down; a short, dated record beats a perfect one written later. (Practice advice from the curriculum row, not a sourced rule.)

Checked against the tools and docs as of 2026-10-02.